Skip to main content

Table 2 Optimum results for objective functions and other parameters

From: A three-layer supply chain integrated production-inventory model under permissible delay in payments in uncertain environments

Parameter

Case 1

Case 2

ATP∗

1,039.45

1,108.93

p s ∗

70.49

79.23

T

2.85

1.59

APS∗

246.51

253.56

APM∗

468.25

463.18

APR∗

321.43

390.47