Skip to main content

Table 5 Effects of manufacturing costs’ uncertain degrees on the prices under the mixed structure

From: Equilibrium Analysis of Channel Structure Strategies in Uncertain Environment

\(\tilde {c_{1}}\) \(w_{1}^{DI}\) \(r_{1}^{DI}\) \(p_{1}^{DI}\) \(p_{2}^{ID}\) \(\tilde {c_{2}}\) \(w_{1}^{DI}\) \(r_{1}^{DI}\) \(p_{1}^{DI}\) \(p_{2}^{ID}\)
8.2371 8.2435 16.4806 17.4587 8.1909 8.2517 16.4426 17.4109
8.2176 8.2546 16.4722 17.4630 8.2022 8.2573 16.4595 17.4470
8.1981 8.2657 16.4638 17.4673 8.2135 8.2630 16.4765 17.4832
8.1786 8.2768 16.4554 17.4716 8.2248 8.2687 16.4935 17.5194